
251
-Modell - 11/12 - Ausgabe 09/11 - 2096161 - BUE-0036-10EN
Inspection plan
18
18Inspec tion plan
Pos. Component Activity Interval
1 Auxiliary support Lubrication Annually
2 Joints, hinges Lubrication Annually
3 Refrigerator, heater, boiler, cook-
er, lighting, flap and door closures,
toilet, seat belts
Function check Annually
4 Windows, skylights Function check, water
ingress test
Annually
5 Upholstery, curtains, blinds Visual check Annually
6 Sealing strips, edges, rubber Check for damage Annually
7 Water supply Water ingress test Annually
8 Hot-air system Function check, clean
fan wheel as neces-
sary
Annually
9 Underbody protection, floor skirt at-
tachment
Visual check Annually
10 Electrical system Function check Annually
11 Gas system Official gas inspection Every
two years
12 Connections between the chassis
and body
Check Every
two years
13 Underbody Visual check, repair
underbody protection
as necessary
Every
two years
Kommentare zu diesen Handbüchern