Argo AES Series Bedienerhandbuch Seite 93

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 262
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 92
93
A
-Modell - 11/12 - Ausgabe 09/11 - 2096161 - BUE-0036-10EN
Gas system
7
Open regulator tap on the gas bottle.
Press the release button for 10 seconds.
Turn the knob on the reversing valve to the changed bottle. Open the
release button when the display is green.
Set the knob on the reversing valve with a half-turn, so that the newly
replaced gas bottle will serve as a reserve bottle.
7.7 DuoControl switching facility (special equipment)
The DuoControl is an automatic switching facility with a remote display for a
two-bottle gas system. The DuoControl switching facility automatically
switches gas supply from the primary bottle to the reserve bottle as soon as
the primary bottle is either empty or no longer ready for operation. The gas
appliances may still continue operation. The DuoControl switching facility is
suitable for all commercial gas bottles from 3 kg to 33 kg.
Construction of the unit The DuoControl switching facility consists of a reversing valve (Fig. 111,3) and
an operating unit (Fig. 112). The reversing valve is installed between the gas
tubes (Fig. 111,2 and 5). The knob (Fig. 111,4) on the reversing valve is used
to select which of the gas bottles is to be used as a primary bottle and which
is to be used as a reserve bottle.
The reversing valve is equipped with the regulator defroster Eis-Ex. This pre-
vents damage to the gas system during the winter months.
Only the electrical functions can be switched at the operating unit (Fig. 112).
The regulator taps on the gas bottles (Fig. 111,1 and 6) must be opened man-
ually.
The reversing valve provides a constant gas pressure, regardless of which gas
bottle is being drawn upon. The two indicator lamps on the operating unit indi-
cate the level of the primary bottle. When the green indicator lamp (Fig. 112,6)
illuminates, the primary bottle is full. When the red indicator lamp (Fig. 112,5)
illuminates, the primary bottle is empty. In this case, the reserve bottle is used
for the gas supply.
X Do not use the switching facility in closed spaces.
Z Also read the manufacturer's instruction manual.
Fig. 111 DuoControl switching facility Fig. 112 Operating unit
Seitenansicht 92
1 2 ... 88 89 90 91 92 93 94 95 96 97 98 ... 261 262

Kommentare zu diesen Handbüchern

Keine Kommentare